Skip Navigation

The Business Arts Plaza, a multi-level complex with 8 stories of office space and 4 levels of underground parking, exhibited significant cracking across all parking levels.

To assess the structural integrity and capacity to support design loads, an in-situ load test was recommended. The 24-hour test subjected the structure to a load of 100,000 pounds.

Project Overview

  • CSS V-Wrap™ installed across 50,000 SF
  • Load test with loads exceeding 100,000 lbs

The Business Arts Plaza, a multi-level complex with 8 stories of office space and 4 levels of underground parking, exhibited significant cracking across all parking levels.

To assess the structural integrity and capacity to support design loads, an in-situ load test was recommended. The 24-hour test subjected the structure to a load of 100,000 pounds.

Although no significant damage was detected, concrete repairs and structural strengthening were provided as a proactive measure. STRUCTURAL TECHNOLOGIES’ CSS V-Wrap™ was selected for its lightweight, durable strengthening capabilities. As an exclusive licensee, STRUCTURAL applied approximately 50,000 square feet of CSS V-Wrap™ across all parking levels. Additionally, partial concrete repairs were performed to restore around 108,000 square feet of delaminated concrete and address cracks.

The repairs were executed in phases to minimize disruption to operations, and significantly enhanced the durability and performance of this vital structure for years to come.

PROJECT INFO

  • Location: Burbank, CA
  • Owner: Business Arts Plaza, Inc.
  • Specialty Contractor: STRUCTURAL
  • Material Supplier: STRUCTURAL TECHNOLOGIES

SOLUTIONS

MARKET

Related Projects

Contact Us

Ready to take the next step? Reach out to our team today and let’s work together on solutions to your infrastructure challenges.

Scroll to top