GLWA Event Header3

Great Lakes Water Authority is wrapping up a 3-year structural improvement project which includes 9 CSO facilities. The project included below and above-grade structural repairs identified during an evaluation period with Pullman’s design-build partner (Wade Trim).

Repair items included; structural concrete repairs, safety & access improvements, durability upgrades, and façade waterproofing among many other items. All facilities were captured with reality capture software allowing for virtual visits and review of the sites from any remote location.

The project included below and above-grade structural repairs identified during an evaluation period with Pullman’s design-build partner, Wade Trim.

Date: Tuesday, September 24, 2024

Location: 11900 Freud St, Detroit, MI 48215

Agenda

9:00 am Introductions – GLWA, Pullman, Wade Trim, & Structural Technologies
9:15 am Procurement process, condition assessment, review of project details
10:30 am Site visit to review facility and work scope
11:30 am Lunch, open discussion, and networking