- All
- Commercial/Public
- Industrial
- Power
- Transportation
- Water/Wastewater

Post-Tensioned Slab Opening for New Staircase

Strengthening of Arena’s Beams

Delayed Coking Unit Chute Plate System

Post-Tensioning on Texas Skyscraper

Sabah Al-Salem University Fire Damage Repairs

City of Provo West Side Tanks #1 & #2

Emergency Pre-Stressed Concrete Cylinder Pipe Upgrade

Leon County Courthouse Parking Garage Strengthening

Construction of Clinker Silos

Silos Strengthened at Power Plant

Post-Tension Parking Garage Repair

New Light Rail Station Waterproofing

Entergy Transmission Towers

Grout Replacement Reduces Vibration on Turbine Generator

BWI Airport Central Parking Structure

Vacuum Tower LifeJacket® Installation

Eisenhower Barracks Repair & Strengthening

Coke Pit Wall System Improves Long-Term Durability

Innovative Parking Garage P-T Repair

New Construction with P-T: The Surf Club

Compressor Foundation Analysis & Repair Reduces Vibration

Owings Mills Town Center Garage

Galvanic Cathodic Protection of Power Plant Dock

San Jose / Santa Clara Digesters Upgrade

Polyshield® System for Vacuum Pumps

Structural Defects in Courthouse Square

Punching Shear Repaired with V-Wrap™ CFRP System

Corrosion Control at Dockside Condominiums

Post Tensioning Repair Robinson Garage

Medical Research Building IV

Nuclear Power Plant Roofing Repairs

Parkland Hospital Expansion

Phased Rehabilitation Returns Sulfur Pit to New Condition

Cathodic Protection of Historic Terra Cotta Cornice

Providence Pipe Rehabilitation

Kennecott Humboldt Mill – Structural Strengthening

Miami-Dade Implements StrongPIPE® System for Pipeline Upgrades

Design-Build Grouting Solution Stops Leakage

Power Plant Storm Water Pipe Strengthening

Kearns 5 MG Water Storage Tank

Nappanee Long Term Control Improvements Project

Pipeline Repair at Nuclear Generating Station

Fallingwater Strengthening

Strengthening and Restoration of Casino

Investigate Design-Build Approach is Successful for Grouting Repair

Woodrow Wilson Bridge Heavy Lifting

North Arm Fraser River Crossing

Interconnected Silos Built with Post-Tensioning

ICCP System Replacement at Nuclear Plant

CFRP System Repairs Riveted Steel Penstock

The Passages of Jupiter Island

Two-Phased Repair of a Cooling Tower Basin

Indian Creek Village Bridge Restoration