- All
- Commercial/Public
- Industrial
- Power
- Transportation
- Water/Wastewater

Power Plant Storm Water Pipe Strengthening

Silos Strengthened at Power Plant

Polyshield® System for Vacuum Pumps

Woodrow Wilson Bridge Heavy Lifting

Grout Replacement Reduces Vibration on Turbine Generator

Strengthening and Restoration of Casino

The Passages of Jupiter Island

New Structural Liner and Cast-in-Place Roof for Sulfur Pit

Huey P. Long Bridge Widening Phase 1

Pipeline Repair at Nuclear Generating Station

Cathodic Protection of Historic Terra Cotta Cornice

CFRP System Repairs Riveted Steel Penstock

Structural Defects in Courthouse Square

Miami-Dade Implements StrongPIPE® System for Pipeline Upgrades

Compressor Foundation Analysis & Repair Reduces Vibration

Galvanic Cathodic Protection of Power Plant Dock

Punching Shear Repaired with V-Wrap™ CFRP System

New Construction with P-T: The Surf Club

North Arm Fraser River Crossing

Sabah Al-Salem University Fire Damage Repairs

Phased Rehabilitation Returns Sulfur Pit to New Condition

Solution Stops Water Infiltration

Strengthening of Arena’s Beams

Post-Tensioning on Texas Skyscraper

Providence Pipe Rehabilitation

Coke Pit Wall System Improves Long-Term Durability

Bayonne Bridge Abutment Rehabilitation

Post-Tension Parking Garage Repair

Indian Creek Village Bridge Restoration

Delayed Coking Unit Chute Plate System

Interconnected Silos Built with Post-Tensioning

Investigate Design-Build Approach is Successful for Grouting Repair

Vacuum Tower LifeJacket® Installation

ICCP System Replacement at Nuclear Plant

New Light Rail Station Waterproofing

Owings Mills Town Center Garage

Innovative Parking Garage P-T Repair

Celanese Rainwater Treatment Tanks

Nuclear Power Plant Roofing Repairs

Design-Build Grouting Solution Stops Leakage

Corrosion Control at Dockside Condominiums

Nappanee Long Term Control Improvements Project

Strengthening & Reinforcement of a New Chimney

City of Provo West Side Tanks #1 & #2

Post-Tensioned Slab Opening for New Staircase

Entergy Transmission Towers

Parkland Hospital Expansion

Leon County Courthouse Parking Garage Strengthening

Two-Phased Repair of a Cooling Tower Basin

Kennecott Humboldt Mill – Structural Strengthening

San Jose / Santa Clara Digesters Upgrade

Emergency Pre-Stressed Concrete Cylinder Pipe Upgrade

Kearns 5 MG Water Storage Tank

BWI Airport Central Parking Structure

Medical Research Building IV