- All
- Commercial/Public
- Industrial
- Power
- Transportation
- Water/Wastewater

Critical Cat Cracker Concrete and Steel Repairs

DivcoWest Atelier Garage Waterproofing

Critical Spot Repairs of 30- and 90-inch Circulating Water System Piping

Phased Repair Approach Resolves Silo Deterioration

City of Winnipeg RAS Piping Renewal

Spiral-Wrapped Post-Tensioned Concrete Aeration Tank Repair

CSS V-Wrap™ Installation Provides Long-Term Solution to Nuclear Storage Tank

Four Seasons Hotel and Residences

36” PCCP Transmission Main Upgrade

24-inch Penstock at Muddy Run Hydroelectric Station renewed using Carbon Fiber System

DC Water National Arboretum Aerial Sewer Crossing Renewal

70-Inch Steel Pipe Renewal with StrongPIPE® V-Wrap™ Carbon Fiber System

City of Bluffdale Triangular Tank

CM/GC Repair of Roosevelt Bridge

Steel Pipe Waterline Strengthened with Long-Term Repair

Emergency Carbon Fiber System Repairs Piping to Regulation Standards

Cathodic Protection of Intake Structures

CFRP System Repairs Riveted Steel Penstock

San Jose / Santa Clara Digesters Upgrade

City of Provo West Side Tanks #1 & #2

Celanese Rainwater Treatment Tanks

New Structural Liner and Cast-in-Place Roof for Sulfur Pit

Grout Replacement Reduces Vibration on Turbine Generator

Coke Pit Wall System Improves Long-Term Durability

Phased Rehabilitation Returns Sulfur Pit to New Condition

Post Tensioning Repair Robinson Garage

Power Plant Storm Water Pipe Strengthening

Post-Tensioned Slab Opening for New Staircase

Compressor Foundation Analysis & Repair Reduces Vibration

Eisenhower Barracks Repair & Strengthening

Polyshield® System for Vacuum Pumps

Delayed Coking Unit Chute Plate System

Indian Creek Village Bridge Restoration

Punching Shear Repaired with V-Wrap™ CFRP System

Entergy Transmission Towers

The Passages of Jupiter Island

Nappanee Long Term Control Improvements Project

Two-Phased Repair of a Cooling Tower Basin

Bayonne Bridge Abutment Rehabilitation

BWI Airport Central Parking Structure

Construction of Clinker Silos

Owings Mills Town Center Garage

Post-Tensioning on Texas Skyscraper

Huey P. Long Bridge Widening Phase 1

Medical Research Building IV

North Arm Fraser River Crossing

Interconnected Silos Built with Post-Tensioning

Woodrow Wilson Bridge Heavy Lifting

Innovative Parking Garage P-T Repair

Fallingwater Strengthening

Kearns 5 MG Water Storage Tank

Parkland Hospital Expansion

New Construction with P-T: The Surf Club

Corrosion Control at Dockside Condominiums

Sabah Al-Salem University Fire Damage Repairs

Solution Stops Water Infiltration

ICCP System Replacement at Nuclear Plant

Investigate Design-Build Approach is Successful for Grouting Repair

Design-Build Grouting Solution Stops Leakage

Nuclear Power Plant Roofing Repairs

Pipeline Repair at Nuclear Generating Station

Kennecott Humboldt Mill – Structural Strengthening

New Light Rail Station Waterproofing

Post-Tension Parking Garage Repair

Structural Defects in Courthouse Square

Galvanic Cathodic Protection of Power Plant Dock

Strengthening & Reinforcement of a New Chimney

Emergency Pre-Stressed Concrete Cylinder Pipe Upgrade

Vacuum Tower GalvaJacket™ Installation

Strengthening of Arena’s Beams

Strengthening and Restoration of Casino

Providence Pipe Rehabilitation

Silos Strengthened at Power Plant

Miami-Dade Implements StrongPIPE® System for Pipeline Upgrades

Leon County Courthouse Parking Garage Strengthening

Cathodic Protection of Historic Terra Cotta Cornice