Case Studies

STRUCTURAL TECHNOLOGIES has been involved in many challenging projects. Use the filters below to sort by market and read how we help solve the problems.

 

 

Kearns 5 MG Water Storage Tank
Public
,
,
,
,
Parkland Hospital Expansion
Commercial
The new Parkland Hospital contains a 62-foot cantilever with a 120-foot span over an opening.
,
Parkland is also recognized as one of the nation’s leading teaching hospitals with hundreds of people being treated daily.
,
STRUCTURAL TECHNOLOGIES / VSL’s bonded multistrand post-tensioning systems were used in the construction of the concrete transfer girder.
,
Teams work on installing the post-tensioning systems to the massive girders.
,
Approximately 35 miles of post-tensioning tendons were used in the conduits.
LifePanel™ System Used to Repair Harbour Light Towers
Harbour Light Towers
,
Harbour Light Towers
,
Harbour Light Towers
,
Harbour Light Towers
,
Harbour Light Towers
,
Harbour Light Towers
,
Harbour Light Towers
,
Harbour Light Towers
,
Harbour Light Towers
,
Harbour Light Towers
Blue Plains Digesters
Public
,
,
,
,
Seismic Upgrades to Historic UC Berkeley Stadium
UC Stadium
,
UC Stadium
,
UC Stadium
,
UC Stadium
,
UC Stadium
,
UC Stadium
Preserving the View at Dockside Condominiums
dockside
,
dockside
,
dockside
,
dockside
Sabah Al-Salem University Fire Damage Repairs
Commercial
Sabah Al-Salem University
,
Sabah Al-Salem University
,
Sabah Al-Salem University
,
Sabah Al-Salem University
,
Sabah Al-Salem University
,
Sabah Al-Salem University
,
Sabah Al-Salem University
,
Sabah Al-Salem University
,
Sabah Al-Salem University
Vacuum Tower LifeJacket Installation
Industrial
View of vacuum tower support structure prior to repair in advanced state-of-deterioration.
,
Concrete core sampling during the condition assessment phase of the project.
,
Delaminated “cover” concrete removed from support beam members exposing corroded reinforcing steel bars and relic indicators of rebar beam stirrups.
,
Exposed steel reinforcement, with new augmented bars and Column ties. Note vessel support Shoring next to column and operating jacketed hot process piping/valves.
,
LifeJacket® installed and strapped into place. Note base grout injection port with lever shut-off ball-valve.
,
View of the annulus cavity during cementitious grouting operations
,
Completed LifeJacket®  installation on the vacuum tower
Design-Build Grouting Solution Stops Leakage
Public
,
,
,
Nuclear Power Plant Roofing Repairs
Power
,
,
,
,
New Light Rail Station Waterproofing
Public, Commercial
,
,
,
Cathodic Protection of Historic Terra Cotta Cornice
Public
,
,
,
,
,
Providence Pipe Rehabilitation
Public
,
,
Galvanic Cathodic Protection of Power Plant Dock
Power
,
,
,
,
Emergency Pre-Stressed Concrete Cylinder Pipe Upgrade
Industrial, Public
,
,
,
Miami-Dade Implements StrongPIPE® System for Pipeline Upgrades
Public
,
,
,
,
Solution Stops Water Infiltration
Commercial
whitneybldg
,
,
whitneybldg
,
whitneybldg
,
whitneybldg
,
whitneybldg
ICCP System Replacement at Nuclear Plant
Power
,
,
,
,
,
Investigate Design-Build Approach is Successful for Grouting Repair
Power
,
,
,
,
,
PPL Brunner Island Steam Electric Station
Power
,
,
,
,
,
Pipeline Repair at Nuclear Generating Station
Power
,
,
,
,
,
,
Kennecott Humboldt Mill - Structural Strengthening
Industrial
,
,
,
,
Post-Tension Parking Garage Repair
Commercial
,
,
,
Structural Defects in Courthouse Square
Public, Commercial
,
,
,
,
,
,
Strengthening & Reinforcement of a New Chimney
Power
,
,
,
Coking Unit Repair
Industrial
,
,
,
,
,
,
,
Strengthening and Restoration of Casino
Commercial
,
,
,
,
,
Leon County Courthouse Parking Garage Strengthening
Public
,
,
,
,
,
,
,
,
The LeJeune Flyover
Public
,
,
,
,
,
Strengthening of Arena's Beams
Public, Commercial
,
,
,